Onsite Environmental Consulting

“OEC has always been on top of their game. They are always knowledgeable, easy to work with and provide a great product with short turn arounds.”
Curtis Ray – Environmental Manager
Lovell Engineering Associates, PC

Do you want to build a dock?

Environmental Permitting

Dock projects usually fall into two categories: exemptions and permits.

Most people qualify for a dock exemption. Often dock contractors handle these, but we can also do it for you. OEC’s expertise proves invaluable when your dock project requires a permit.

Dock projects requiring permits might include docks over 1000 square feet, within navigable waterways, with riparian rights issues, within “Outstanding Florida Waters” or docks that could impact listed species or special aquatic habitats.

In the case of marinas, public access, or any marine structure that generates revenue, a land lease from the state of Florida may be required.

OEC has experience in handling these projects.
Call and let’s discuss your needs. 904.384.7020